What counts as waste

Where Park Royal clay comes from: the geology and the dig

Most of west London is built on London Clay, and building sites dig it out by the million tonne. Where Park Royal clay comes from, how it is dug, and where our first batch began.

Most of west London is built on clay. Dig down through the topsoil and the gravel and you reach it, a thick, heavy clay that runs under much of the city. Building sites reach it constantly, because foundations, basements and tunnels all go down into it, and the amounts are large.

How large is easy to miss. A short distance from our studio, the dig for HS2’s new Old Oak Common station, on the edge of Park Royal, removed around 1.3 million tonnes of London Clay over three years. That is one site. That clay was taken away by conveyor and rail to be reused as fill at sites outside London, which is far better than landfill, but it left as bulk earth, not as a material anyone kept.

This note is about where the clay we work with comes from: what is under the ground here, how it gets dug, where our own first batch began, and why doing this work in west London matters.

What is under Park Royal

Much of this part of London sits on London Clay, a thick, fairly even layer of clay that was laid down under the sea tens of millions of years ago. In places there is a cap of sand and river gravel over the top, left by old courses of the Thames, but the clay is the bulk of what a deep dig goes through. It is stiff, grey-blue when fresh, and turns brown as it weathers. London’s old brickmakers mostly dug the brickearth that lies on top of it, rather than the London Clay itself.

We can only speak to the one batch we have tested, and London Clay is not the same from one site to the next. But the plain point holds: the ground here is clay, and a great deal of it comes out whenever something is built.

The dig, and where it goes

On most sites the clay is dug, classified, loaded onto lorries and driven away. The haulage, and the fee the landfill charges to take it, are real costs, with landfill tax on top, and a lot of it ends up buried somewhere else. Some is reused on site, or under the rules the development industry already has for clean excavated soil, but the default is still to treat it as waste. We have set out the costs and the rules for developers in a separate note on what happens to clay dug from a London building site.

That is the gap the practice sits in. A material that is dug by the million tonne, a short distance away, and mostly paid to be taken away.

Where our batch came from

Our first project began with one batch of this clay, recovered from that same dig for the Old Oak Common station rather than sent away with the rest. It did not arrive as anything usable. It came as raw lumps, which we broke up, dried, slaked in water until they fell apart, mixed, sieved through a fine mesh to take out grit and roots, and firmed up on a plaster slab until it could be cut into test bars 10 cm long. Only then could we fire it and find out what it does. So far it reaches its tightest, densest state near 1050 C, at about 0.7% water absorption. The measured numbers, the table and the charts are on the Park Royal clay findings page, and for the wider picture of construction-site clay and what it can become, see our working guide to clay from London construction sites.

Why doing it here matters

Park Royal is one of the largest industrial estates in Europe, around 450 hectares with roughly 2,000 businesses, and our studio sits inside it. That proximity is the whole point. Clay dug in west London, tested in west London, and one day used in west London, avoids most of the transport that makes a low-impact material stop being low impact. A material is only really local if it does not have to travel far.

It also means the supply is on the doorstep. We are not short of clay. We are short of the time and the testing to find out which of it is any good, and that is the slow part of the work.

How early this is

This is one studio, working through a small number of materials a year, by hand. One batch tested so far is not a claim about all London clay, or about the next dig down the road. What it is is a start, evidence that a material the city pays to throw away can be recovered, tested in the open, and turned into something. The rest is more diggings, more batches, and more notes like this one.